Accurate estimates before breaking ground.
Construction cost overruns start with underestimated scope. We break down your plans into a complete bill of quantities, price it against current market rates, and present the number with every assumption itemised.
- Starting from
- $500
- Turnaround
- 2–10 days
- Formats
- PDF, DWG, DXF
- All trades
- Covered
General Contract or specific trades.
Need a full build estimate, or just electrical and MEP? Select the service type that matches your scope.
General Contract
Complete cost breakdown for the entire build. All trades included: from site preparation and foundation through finishes and final inspection.
Our Trades
Select only the specific trades you need. Perfect when you have some costs covered or are self-performing certain work. Choose any combination of our 10 disciplines.
Flexible pricing · Select 1 or more trades
Every construction trade, itemised.
From earthwork to finishes. Each trade estimated with material quantities, labour hours, and equipment needs broken down by CSI division.
Concrete Estimating
Foundation, slabs, walls, footings, and all concrete work quantities and costs.
Electrical Estimating
Wiring, fixtures, panels, conduit, and complete electrical system takeoffs.
Interior & Exterior Finishes
Drywall, paint, flooring, cladding, and all finish materials and labour.
Masonry Estimating
Brick, block, stone, mortar, and masonry labour with waste factors.
MEP Estimating
Mechanical, electrical, and plumbing systems — integrated cost breakdown.
Metals Estimating
Structural steel, rebar, metal decking, stairs, and ornamental metals.
Openings Estimating
Doors, windows, frames, hardware, and glazing with installation costs.
Thermal/Moisture Protection Estimating
Insulation, roofing, waterproofing, and building envelope systems.
Sitework Estimating
Excavation, grading, utilities, paving, landscaping, and site preparation.
Lumber Takeoff
Framing, trusses, joists, sheathing, and all rough carpentry materials.
Priced by project size, not by guesswork.
Four tiers based on square footage. Turnaround and pricing scale with complexity. Larger or unusual projects quoted after a brief review.
Up to 3,500 sq ft
Residential
$500 – $700
Commercial
$750 – $1,000
Small projects. Complete material and labour breakdown.
Up to 5,000 sq ft
Residential
$650 – $900
Commercial
$1,150 – $1,500
Medium builds with standard complexity.
Up to 8,000 sq ft
Residential
$1,500 – $2,000
Commercial
$2,000 – $2,500
Large or multi-unit projects with detailed specifications.
Over 8,000 sq ft
Residential
Contact for quote
Commercial
Contact for quote
Industrial or complex projects — priced after scope review.
Projects over 8,000 sq ft? Submit your plans for a custom quote within one business day.
Five steps from plans to delivered estimate.
Submit your drawings, we measure and price every line item, and deliver a detailed spreadsheet. One revision round included.
Submit your project
Upload plans, select the service type, and describe your project. We accept PDF, DWG, and image formats.
10 minutes
We review and clarify
A construction estimator reviews your drawings. If anything is unclear or missing, we reach out within one business day.
1 business day
Quantity takeoff begins
Every material is measured from your plans. Concrete volumes, lineal footage, unit counts — itemised by trade.
During estimate
Priced and delivered
Material costs at current rates, labour by trade, equipment, and contingency. Delivered as a detailed spreadsheet with line-item breakdown.
Per turnaround tier
Questions and revisions
One round of clarifications or minor adjustments included. Major scope changes quoted separately.
No hidden fees
How the number is actually built.
Most estimates hide the method. We show you exactly how quantities are measured, priced, and adjusted for real-world conditions.
Measured from your drawings
Quantities are scaled and calculated from architectural, structural, and MEP plans — not guessed. Every measurement is itemised by CSI division.
Current market pricing
Material costs reflect supplier pricing in your region for the month you are building. Labour rates account for local wage conditions and project complexity.
Waste and contingency factored
Material waste percentages vary by type — concrete, lumber, tile, and finishes each carry realistic overage. Contingency is a separate line, not buried.
Equipment and temp works
Crane rental, scaffolding, site power, hoarding, and temporary facilities are costed where drawings indicate they will be needed.
The inputs that produce an accurate estimate.
More complete plans mean tighter numbers. If something is missing, we will flag it and estimate around it with assumptions itemised.
- Architectural plans (floor plans, elevations, sections)
- Structural drawings if available
- MEP drawings for mechanical, electrical, plumbing trades
- Site plan showing grading and utilities
- Specifications or material preferences
- Project timeline or required delivery date
Do not have all of these? Submit what you have — we will work with partial drawings and let you know what assumptions we are making.
Submit your project for detailed pricing.
Fill out the form below and upload your plans. We will review within one business day and either deliver the estimate or come back with clarifying questions.
Questions we get asked before the first call.
Something not covered here? Ask directly — a person answers, and it is usually the same person who would do the work.
PDF, DWG, DXF, and common image formats (PNG, JPG). If your plans are in another format, reach out — we can usually work with it.